How to Create a Procurement Management Plan in 7 Steps
How to Create a Procurement Management Plan in 7 Steps

How to Create a Procurement Management Plan in 7 Steps

Niti Samani
Niti Samani
Table of Contents
Table of Contents

Have you ever wondered how successful organizations manage their procurement processes to ensure efficiency and cost-effectiveness? The answer lies in having a well-structured procurement management plan. In today's competitive business landscape, effective procurement management is crucial for acquiring the goods and services needed to operate efficiently and meet strategic objectives. 

A procurement management plan serves as a roadmap for managing these activities, guiding teams through each phase of the process. By establishing clear goals, defining roles and responsibilities, and outlining procurement strategies, organizations can optimize their efforts, reduce costs, and mitigate risks.

Creating a procurement management plan involves a systematic approach that includes identifying procurement needs, setting measurable objectives, and developing a comprehensive strategy. Each step in this process is designed to align procurement activities with broader organizational goals while ensuring that stakeholder expectations are met.

A thoughtful plan not only enhances the efficiency of procurement processes but also fosters positive relationships with suppliers, ultimately contributing to the overall success of projects and the organization as a whole.

The importance of a procurement management plan extends beyond mere compliance with internal processes; it serves as a critical tool for achieving operational excellence.

Organizations that invest time and resources into developing a robust procurement strategy are better equipped to navigate market fluctuations, respond to changing demands, and capitalize on emerging opportunities.

Additionally, effective procurement practices can lead to significant cost savings and improved quality of goods and services, directly impacting an organization’s bottom line.

To facilitate the creation and management of procurement management plans, tools like Deskera ERP offer invaluable support. Deskera ERP streamlines procurement processes by automating workflows, providing real-time insights, and integrating procurement activities with other business functions. 

With its comprehensive features, Deskera ERP empowers organizations to make informed decisions, enhance supplier management, and ultimately drive greater efficiency in their procurement efforts.

In this guide, we will outline the seven essential steps to creating a successful procurement management plan, equipping you with the knowledge and tools necessary for effective procurement management.

Streamline and Automate Procurement Management with Deskera ERP
Enhance Profitability and Productivity

What is a Procurement Management Plan?

A procurement management plan is a strategic document that outlines how an organization will manage its procurement activities throughout the life cycle of a project or within its operations.

It serves as a roadmap for acquiring goods, services, or resources from external suppliers while ensuring efficiency, cost-effectiveness, and compliance with organizational policies and regulations.

Key Components of a Procurement Management Plan

  1. Procurement Objectives: Defines the purpose and goals of procurement, such as cost control, quality assurance, and timely delivery.
  2. Roles and Responsibilities: Identifies who is responsible for procurement activities, including the selection and management of suppliers, contract negotiations, and approvals.
  3. Procurement Process: Describes the procedures for sourcing, supplier selection, bidding, and contract award, as well as how procurement will be managed throughout the project.
  4. Supplier Selection Criteria: Establishes the standards by which vendors or suppliers will be evaluated, which may include cost, quality, reliability, and past performance.
  5. Contract Management: Outlines the process for drafting, reviewing, and approving contracts, including legal and financial considerations.
  6. Risk Management: Identifies potential risks related to procurement (e.g., supplier delays, cost overruns) and describes strategies for mitigating them.
  7. Budget and Timeline: Provides an overview of the budget allocated for procurement activities and sets timelines for different phases of the procurement process.
  8. Performance Monitoring: Defines metrics and KPIs (Key Performance Indicators) to measure the effectiveness of procurement activities, such as cost savings, supplier performance, and procurement cycle times.

Importance of a Procurement Management Plan

A procurement management plan is essential for organizations because it provides a structured approach to managing procurement processes, ensuring efficiency, cost control, and risk mitigation.

Here are some key reasons why a procurement management plan is important:

1. Cost Efficiency and Control

A well-crafted procurement plan enables organizations to obtain goods and services at the best possible price without sacrificing quality. It includes strategies for competitive bidding, negotiations, and cost management, helping businesses to control expenses and prevent overspending.

2. Risk Mitigation

Procurement activities come with risks, such as supplier delays, cost fluctuations, and quality issues. A procurement plan identifies these risks early on and outlines strategies to mitigate them, including alternative suppliers and contingency plans. This helps minimize disruptions and ensures smooth project execution.

3. Ensures Compliance

Procurement processes often need to adhere to legal, regulatory, and corporate standards. A procurement management plan ensures that all purchasing activities comply with laws, industry regulations, and internal policies, avoiding legal penalties and maintaining corporate accountability.

4. Streamlined Processes

By providing clear guidelines for supplier selection, contract management, and purchasing workflows, the procurement plan ensures that all team members follow a consistent process. This reduces delays and confusion, making procurement more efficient and transparent.

5. Improved Supplier Relationships

A structured procurement plan facilitates better communication and negotiations with suppliers. By defining the supplier selection criteria and contract terms clearly, it promotes long-term, mutually beneficial relationships, leading to improved service and quality.

6. Enhanced Decision-Making

The procurement plan outlines criteria and performance metrics (e.g., cost, quality, delivery time) that help decision-makers evaluate and select suppliers effectively. It also includes a framework for monitoring procurement performance, allowing managers to make data-driven improvements.

7. Alignment with Organizational Goals

A procurement management plan ensures that purchasing activities align with the organization’s broader objectives, such as cost savings, sustainability, or project timelines. This alignment is crucial for maintaining consistency in operations and achieving long-term business goals.

8. Accountability and Transparency

By documenting all procurement steps, roles, and responsibilities, the plan ensures accountability within the team and across departments. It establishes a transparent process where decisions are clearly communicated and documented, reducing misunderstandings and improving accountability.

9. Timely Delivery of Goods and Services

Procurement planning ensures that products or services are delivered on time to support operational or project schedules. By establishing clear timelines for each phase of the procurement process, it helps avoid delays that could impact production or project milestones.

10. Optimized Inventory Management

For businesses dependent on regular supplies, such as manufacturers or retailers, a procurement management plan ensures that inventory is managed efficiently. It helps maintain the right balance of stock, reducing the risk of shortages or overstock, while keeping storage costs under control.

In summary, a procurement management plan is vital for improving operational efficiency, reducing risks, enhancing supplier relationships, and ensuring that procurement aligns with the organization's overall objectives.

What is the Role of Procurement Management Plan?

The role of a procurement management plan is to provide a comprehensive framework for managing the procurement process within an organization or project.

It outlines the strategy, processes, and responsibilities involved in acquiring goods, services, or resources from external suppliers. The plan plays a crucial role in ensuring procurement activities are efficient, cost-effective, and aligned with organizational goals. 

Below are the key roles of a procurement management plan:

1. Guiding the Procurement Process

The procurement management plan serves as a roadmap for how procurement will be executed. It outlines the methods and steps to follow, including supplier selection, contract negotiations, purchase orders, and payment terms. This ensures consistency and order in procurement activities.

2. Ensuring Cost Efficiency

One of the primary roles of the procurement plan is to optimize the use of resources and reduce costs. By setting clear objectives and strategies, it helps the organization secure goods and services at competitive prices without compromising on quality. It also identifies opportunities for cost savings, such as bulk purchasing or long-term supplier contracts.

3. Risk Identification and Mitigation

The plan plays a critical role in identifying potential procurement risks, such as supplier delays, cost overruns, or supply chain disruptions. It establishes strategies to mitigate these risks, such as having contingency plans or alternate suppliers, ensuring the smooth continuity of operations.

4. Defining Roles and Responsibilities

The procurement management plan clarifies who is responsible for various tasks within the procurement process. It assigns roles to team members, such as identifying needs, selecting suppliers, or managing contracts. This avoids confusion and ensures accountability across departments.

5. Supporting Supplier Management

A procurement plan helps manage relationships with suppliers by outlining clear criteria for their selection and performance evaluation. It provides guidelines on how to engage suppliers, set expectations, and monitor their performance, which contributes to better supplier relations and more reliable service.

6. Establishing Compliance and Governance

The plan plays a vital role in ensuring compliance with internal policies, industry standards, and legal regulations. By documenting procurement procedures, it helps the organization adhere to ethical practices, environmental standards, and contractual obligations, minimizing the risk of legal issues or regulatory fines.

7. Facilitating Effective Communication

Procurement often involves multiple stakeholders, including internal departments (finance, operations, legal) and external parties (suppliers, vendors). The plan acts as a communication tool, ensuring that all parties are aware of their responsibilities, timelines, and expectations, which promotes transparency and collaboration.

8. Providing a Framework for Monitoring and Evaluation

The procurement management plan includes performance metrics and key performance indicators (KPIs) to assess the effectiveness of the procurement process. It helps track cost savings, supplier performance, delivery times, and procurement cycle efficiency. This continuous monitoring enables improvement and optimization of procurement strategies over time.

9. Aligning Procurement with Business Goals

The plan ensures that procurement activities are in line with the organization’s broader objectives, such as sustainability, innovation, or cost reduction. It ensures that purchasing decisions contribute to long-term business success and support the company’s operational and strategic priorities.

10. Ensuring Timely Delivery of Goods and Services

The plan ensures that timelines are clearly established for each phase of procurement, from sourcing and supplier evaluation to delivery and payment. This role is crucial in avoiding delays that can affect the overall project or business operations.

11. Managing Contract Lifecycle

The procurement management plan includes strategies for managing the entire lifecycle of contracts—from drafting and negotiation to execution and closure. It ensures that contracts are handled efficiently, reducing the risk of disputes and ensuring that the organization gets the agreed-upon value from suppliers.

How to Create a Procurement Management Plan: A 7-Step Process

Creating a procurement management plan is essential for managing the procurement of goods, services, and resources efficiently while ensuring alignment with business goals. Below is a comprehensive guide that combines the 7-step approach and the process of developing a procurement management plan.

1. Identify Procurement Needs

The first step in developing a procurement management plan is understanding what the project or organization needs. This involves:

  • Needs assessment: Determine the specific goods, services, or resources required for the project.
  • Scope definition: Clarify the quantity, quality, and timelines for acquiring these items.
  • Stakeholder input: Collaborate with key departments (such as finance, operations, and legal) to ensure the identified needs are aligned with the project’s goals and the organization’s overall objectives.

2. Establish Procurement Objectives and Goals

Once the needs are defined, the next step is to set clear and measurable objectives for the procurement process. These goals guide how procurement activities will be carried out and should include:

  • Cost-effectiveness: Set goals to stay within budget while maintaining the desired quality.
  • Quality control: Ensure that the procured goods or services meet specific quality standards.
  • Timeliness: Define delivery timelines to avoid project delays.
  • Risk management: Identify potential risks, such as supplier delays or market price fluctuations, and establish strategies for mitigating these risks.

3. Develop a Procurement Strategy

This step involves crafting a comprehensive procurement strategy that outlines how the procurement process will be executed. The strategy should address:

  • Procurement methods: Decide whether competitive bidding, direct purchases, or long-term contracts with suppliers are most appropriate.
  • Make-or-buy analysis: Determine whether it is more cost-effective to buy goods/services from external suppliers or to produce them in-house.
  • Supplier selection criteria: Define the factors you’ll use to evaluate and select suppliers, such as cost, quality, delivery time, and vendor reputation.
  • Procurement risks: Identify potential risks, such as supply chain disruptions, and plan for mitigating these risks (e.g., having alternative suppliers).

4. Define Roles and Responsibilities

The procurement management plan must clearly define who is responsible for each aspect of the process. This avoids confusion and promotes accountability. Key roles include:

  • Procurement manager: Oversees the procurement process and ensures alignment with business goals.
  • Stakeholders: Departments like finance, operations, and legal provide input and approvals for procurement activities.
  • Decision-makers: Senior management or project managers who will authorize large purchases or sign off on final contracts.
  • Team members: Responsible for tasks like supplier research, bid evaluations, and contract management.

5. Conduct Market Research and Supplier Evaluation

After roles are defined, you need to assess the market to identify potential suppliers. This process includes:

  • Market research: Identify suppliers capable of meeting your procurement needs. Compare their offerings, capabilities, and pricing models.
  • Request for Proposals (RFPs): If necessary, send out RFPs to collect bids and proposals from potential suppliers.
  • Supplier evaluation: Evaluate suppliers based on pre-established criteria, such as cost, quality, reliability, and delivery capabilities.
  • Supplier selection: Select the most suitable suppliers for the project, focusing on both cost and quality considerations.

6. Develop Contracts and Define Terms

Once the supplier is selected, formalizing the procurement process through contracts is essential. This step includes:

  • Contract drafting: Ensure the contract covers all necessary details, such as product specifications, delivery timelines, payment terms, and penalties for non-compliance.
  • Contract negotiation: Negotiate with suppliers to ensure the best terms for your organization, focusing on value, risk mitigation, and performance metrics.
  • Approval process: Work with legal and finance teams to review and approve contracts before they are signed.

7. Implement, Monitor, and Manage Procurement

Once procurement is underway, you must actively monitor progress and ensure all activities align with the plan’s goals. This step includes:

  • Procurement execution: Issue purchase orders and initiate the procurement process according to the terms of the contract.
  • Supplier performance tracking: Regularly monitor supplier performance using Key Performance Indicators (KPIs), such as on-time delivery, cost control, and product quality.
  • Communication management: Maintain clear communication with suppliers to ensure expectations are met and to resolve any issues quickly.
  • Adjusting the plan: If problems arise, be prepared to adjust the procurement strategy, including finding alternate suppliers or renegotiating terms to stay on track.

What are the Post-Procurement Activities?

Post-procurement activities are essential tasks that take place after the procurement process is completed. These activities help ensure that the procurement was successful, contractual obligations were met, and valuable insights are gained for future procurements.

Here are the key post-procurement activities:

1. Inspection and Acceptance of Goods or Services

  • Inspection: Upon delivery, the purchased goods or services must be inspected to ensure they meet the agreed-upon specifications, quality standards, and contract terms.
  • Acceptance: Once inspection is completed and the goods or services meet the required criteria, formal acceptance should take place. This may include signing off on delivery receipts or finalizing service agreements.

2. Payment Processing

  • Invoice review: Ensure that the supplier’s invoice matches the purchase order and delivery receipts. Confirm that the correct quantity, price, and other agreed-upon terms are reflected.
  • Payment: Process the payment as per the agreed payment terms outlined in the contract. Ensure that payments are made on time to maintain good supplier relationships and avoid late fees.

3. Contract Closure

  • Contract completion: Formally close the contract by verifying that all obligations have been met by both parties, including delivery, performance, and payment.
  • Documentation: Maintain records of all contracts, receipts, invoices, and any other relevant documents for auditing and future reference.
  • Final report: Document the outcomes of the procurement process, noting whether the project stayed within budget and met the intended goals.

4. Supplier Performance Evaluation

  • Evaluate performance: Assess the supplier’s performance based on factors like quality, timeliness, cost-effectiveness, and responsiveness.
  • KPI review: Analyze Key Performance Indicators (KPIs) set during the procurement process to see if the supplier met or exceeded expectations.
  • Feedback: Provide feedback to the supplier on their performance and address any issues that arise. This can help improve future collaboration.

5. Procurement Audit and Review

  • Internal audit: Conduct a review or audit of the entire procurement process to ensure that all steps were completed according to organizational policies and regulatory standards.
  • Lessons learned: Identify areas for improvement in the procurement process. Document lessons learned to refine future procurement strategies and processes.

6. Supplier Relationship Management

  • Maintain relationships: If the procurement was successful, keep the relationship with the supplier strong by providing positive feedback and showing appreciation for their service.
  • Develop partnerships: For strategic suppliers, consider building long-term partnerships, especially if their performance has been consistently good.

7. Dispute Resolution (If Necessary)

  • If any disputes or issues occurred during the procurement, use the dispute resolution methods outlined in the contract to resolve them. This may include negotiations, mediation, or legal action depending on the severity of the issue.

8. Inventory and Asset Management (for Goods Procurement)

  • Inventory management: Ensure that all procured goods are properly stored, recorded in the inventory system, and managed according to organizational policies.
  • Asset tracking: For high-value assets, update asset management systems and ensure proper labeling and tracking of the new items.

How Deskera ERP Can Streamline Your Procurement Management

Deskera ERP offers powerful tools that simplify and optimize procurement management for businesses of all sizes.

Here's how Deskera can help:

  1. Automated Procurement Workflow: Deskera automates key procurement processes, including purchase orders, approvals, and supplier management. This reduces manual errors and accelerates procurement activities, ensuring timely delivery of goods and services.
  2. Supplier Management: With Deskera ERP, you can easily manage and evaluate suppliers. It provides a centralized platform for tracking supplier performance, costs, and delivery timelines, helping you select the most reliable vendors.
  3. Real-Time Inventory Tracking: Integration with inventory management ensures that procurement activities are aligned with real-time stock levels. This prevents overstocking or understocking, allowing for just-in-time inventory management.
  4. Cost Control and Budgeting: Deskera enables businesses to track procurement costs and align them with budgetary constraints. It provides detailed reports on spending, helping you manage procurement within budget limits and avoid cost overruns.
  5. Comprehensive Reporting: Deskera’s reporting features give you insights into procurement efficiency, supplier performance, and overall cost savings. These reports help in making informed decisions to optimize future procurement strategies.
  6. Seamless Integration: Deskera ERP integrates procurement with other business functions, including accounting, inventory, and sales. This holistic view ensures that procurement decisions are made with consideration of the business’s overall needs.

By leveraging Deskera ERP, businesses can streamline procurement processes, reduce costs, improve supplier relationships, and ensure that procurement activities align with overall business goals.

Streamline and Automate Procurement Management with Deskera ERP
Enhance Profitability and Productivity

Key Takeaways

  • A procurement management plan is a strategic document that outlines how procurement processes will be conducted, detailing the procurement goals, procedures, roles, and responsibilities necessary for acquiring goods and services efficiently.
  • It ensures that procurement aligns with business objectives, controls costs, mitigates risks, and enhances supplier relationships, ultimately contributing to project success and organizational efficiency.
  • The plan serves as a guide for procurement activities, helps streamline processes, and facilitates effective communication among stakeholders, ensuring that all procurement actions are coordinated and executed according to plan.
  • The procurement process involves several steps, including needs identification, establishing objectives, developing strategies, defining roles, conducting supplier evaluations, creating contracts, and managing procurement execution.
  • How to Create a Procurement Management Plan in 7 Steps:

Identify Procurement Needs: Define what is required and engage stakeholders.

Establish Procurement Objectives and Goals: Set clear, measurable targets for procurement.

Develop a Procurement Strategy: Outline methods, supplier criteria, and risk management strategies.

Define Roles and Responsibilities: Assign specific tasks to team members to ensure accountability.

Conduct Market Research and Supplier Evaluation: Evaluate potential suppliers and select the best fit.

Develop Contracts and Define Terms: Create comprehensive contracts with clear terms.

Implement, Monitor, and Manage Procurement: Continuously track performance and adjust as necessary.

  • Post-Procurement Activities: Important tasks after procurement include inspecting and accepting goods or services, processing payments, closing contracts, evaluating supplier performance, conducting procurement audits, maintaining supplier relationships, and resolving disputes if necessary.
  • Deskera ERP enhances procurement management by automating workflows, providing real-time inventory tracking, enabling supplier management, facilitating cost control, offering comprehensive reporting, and ensuring seamless integration across business functions.
Procurement Best Practices for Executive Success in Manufacturing
To set the foundation for successful procurement, manufacturing executives must establish a clear procurement strategy aligned with the organization’s overall goals and objectives.
Procurement Efficiency: Automating Purchase Orders in Manufacturing
The procurement process is the set of activities involved in acquiring goods and services from suppliers. It can be a complex and time-consuming process, involving many different steps, such as creating purchase orders, requesting quotes, and approving orders.
What is e-Procurement?
The Internet has been a boon for several reasons. Just how much of a boon it truly is, was especially realized during the corona-virus pandemic. The adoption of technology has improved global technology while reducing the need for physical stores and contact. This trait, during the pandemic, has led…
Procurement Checklist for Increasing Operational Efficiency
According to a study by the Institute for Supply Management (ISM), US companies with best-in-class procurement practices can achieve cost savings of up to 18% compared to their peers.
Procurement Analytics Capabilities from Oracle: Learn Everything Here!
Procurement analytics is the process of using data and analytics to make better decisions about the procurement of goods and services help in reducing costs
Top Procurement KPIs for Manufacturing Executives to Track and Improve Performance
These are cost savings and cost avoidance, supplier performance, procurement cycle time, supplier relationship management, inventory management, and more.


Hey 👋! Discover the best! Now!

Everything to Run Your Business

Get Accounting, CRM & Payroll in one integrated package with Deskera All-in-One.

Great! Next, complete checkout for full access to Deskera Blog
Welcome back! You've successfully signed in
You've successfully subscribed to Deskera Blog
Success! Your account is fully activated, you now have access to all content
Success! Your billing info has been updated
Your billing was not updated